PILE FOUNDATION
Selecting the right foundation for a ground-mounted solar PV installation is critical for its success as the use of an incorrect foundation can result in premature refusal, costly change orders and project delays. Selection should be based on a geotechnical study of the project area to determine the best option.
​
To achieve a stable and well built system it is imperative to use the right equipment and experienced personelle, which is why we provide the following:
-
Turn key Ramming foundation services
-
Imported ramming machines, 3 Imported Ramming machines – Operated 16 Hrs / day.
-
7 Tractor mounted compressors – Drilling, Rebar ramming & Auguring.
-
Technically qualified operators and supporting staff
-
In-House Augur teams – up to 800 holes / day(Based on soil type)
-
Template design as per the Civil pedestal drawing to achieve the best possible alignment
-
Experienced teams for Grouting / Concreting as per the design.
-